UBUC Maintenance Documentation

This club exists to provide for its members facilities, opportunity and training for underwater exploration, science, and sport.

Back To Contents

Hydro Test

Back To Contents

Details

Responsible Officers

Procedure Log

Date Member Supplier Cost Comment
2015-10-05 Tim Walsh 180.00 The decision to retain a second filter in-line means that 2 towers will require hydro so I am upping the estimate for cp003
2015-08-14 Tim Walsh Bauer Kompressoren UK Ltd 60.00 Labour: £50.00 + VAT When done along side annual service

Itemlist

, (2015-10-20)

Required Items

Item Attributes In Stores? Replacements to buy

Overview

Both the filter unit on the compressor itself and the second filter for double filtered gas must be hydro tested every 5 years