Hydro Test

Back To Contents

Details

Procedure Log

This procedure has been completed on the following occasions.
Date Member Supplier Cost Comment
2015-10-05 Tim Walsh 180.00 The decision to retain a second filter in-line means that 2 towers will require hydro so I am upping the estimate for cp003
2015-08-14 Tim Walsh Bauer Kompressoren UK Ltd 60.00 Labour: £50.00 + VAT When done along side annual service

Itemlist

This procedure applies to the following items:

(cp003),

Required Items

The following items are referenced in the procedure and will be required to complete it.

This table is populated automatically with the items that are referenced in the text in the instructions.

Item Attributes In Stores?

Instructions

Overview

Both the filter unit on the compressor itself and the second filter for double filtered gas must be hydro tested every 5 years