Compressor Taylor is currently broken

Edit this item

Other Attributes

Part Attributes Applicable Procedures
Main
  • cfm = 8.8
  • kW = 5.5
  • manufacturer = Bauer
  • mass = 130Kg
  • model = PE250 TE F02
  • newvalue = 8754
  • repaircost = 1745
  • serial = 15-14 8867
  • status = broken
  • test = test
  • year = 2015
  • Nitrox Filter
    • manufacturer = midland
    • model = LC 0320
    • year = 2003
Record
Complete
Difficulty Procedure Last Compleated Interval (Months) Estimated Cost
Operation 2015-10-20
Breathing Air Test 2020-11-13 3 50
Manage Nitrox Filter 2017-11-10 4 50
Manage Filter 2020-11-13 4 73
Service 2020-11-13 12 522
Safety Inspection 2020-11-13 36 180
Hydro Test 2020-11-13 60 180
Non-diving oxygen cylinder testing 60
Tower Replacement 2015-10-20 180 2035
Filter Renewal 2003-01-01 240 1050

References

Logs

Add new log entry

Date Member Supplier Cost Comment Type Comment
2023-02-01 UBUC Daemon 1745.00 Condition: broken Manage Nitrox Filter; Filter Renewal; Service; Manage Filter; Breathing Air Test; out of date
2021-04-01 UBUC Daemon 173.00 Condition: damaged Manage Nitrox Filter; Manage Filter; Breathing Air Test; out of date
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd 1195.00 Procedure: Service Serviced by Bauer
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd 1195.00 Procedure: Service Serviced
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd Procedure: Manage Filter Breathing Air Test completed with service
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd Procedure: Breathing Air Test Compressor filter changed with service
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd Procedure: Safety Inspection Safety inspection carried out as part of the service
2020-11-13 Greg Quick Bauer Kompressoren UK Ltd Procedure: Hydro Test Compressor filter stack, didn't actually need a hydro but will do in 5 years. Completed with service
2018-04-10 UBUC Daemon 100.00 Condition: niggle Manage Nitrox Fil.;Breathing Air Test; out of date
2018-03-09 Sam Walder Bauer Kompressoren UK Ltd Condition: working Procedure: Manage Filter Filter changed at 326.45 hours - Filter mass = 791g - Filter hours = 20
2018-02-21 Sam Walder 1433.94 Condition: working We had a major failure at the end of 2017, the attached report lists the details of what happened. DON'T DO THIS AGAIN
2018-02-21 Sam Walder Bauer Kompressoren UK Ltd Condition: working Procedure: Manage Filter Filter changed at 307.2 hours - Filter mass = 1032g - Filter hours = 127.4 (Definitely saturated)
2017-11-10 Sam Walder Bauer Kompressoren UK Ltd Condition: working Procedure: Service Compressor annual service carried out. All was good, but we really should have had it serviced last year as well! All the air tests came back well.
2017-11-10 Sam Walder Bauer Kompressoren UK Ltd Condition: working Procedure: Manage Nitrox Filter Manage Nitrox Fill procedure compleated
2017-11-10 Sam Walder Bauer Kompressoren UK Ltd Condition: working Procedure: Breathing Air Test Breathing air test carried out, all good
2017-10-11 Sam Walder Bauer Kompressoren UK Ltd 87.02 Condition: working Procedure: Manage Filter Filter changed at 179.8 hours. This was a right faff as I did not know we could do this ourselves! Turns out we can and it is really easy! - Filter mass = 849g - Filter hours = 40
2016-04-01 UBUC Daemon 173.00 Condition: damaged Manage Nitrox Fil.;Manage Filter;Breathing Air Test; out of date
2016-02-01 UBUC Daemon 50.00 Condition: niggle Breathing Air Test; out of date
2015-10-20 Chris Bainbridge Condition: working Procedure: Operation Bop Complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Service BAnn Complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Manage Filter BFilt Complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Hydro Test BHysro Complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Tower Replacement BFiltR Complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Safety Inspection BWSE procedure complete
2015-10-20 Chris Bainbridge Condition: working Procedure: Breathing Air Test Airtest complete
2015-09-17 Sam Walder Condition: working Compressor oil filling note - next change 2000 hours (+other changes)
2015-09-15 Sam Walder Condition: working Compressor installed. Quality certificate attached to this entry
2015-08-12 Tim Walsh Condition: decomissioned Not yet installed
2015-08-12 Tim Walsh Bauer Kompressoren UK Ltd 8754.00 Condition: quote New compressor quote
2015-08-12 Tim Walsh Bauer Kompressoren UK Ltd Details of new compressor
2003-01-01 Tim Walsh Procedure: Filter Renewal Filter Unit renewed