Procedure Details

Details about the selected procedure

Back To Contents Page

Editing This Procedure

You can edit this procedure online to update it for the next person who needs to do it.

Operation

Back To Contents

Details

Procedure Log

This procedure has been completed on the following occasions.
Date Member Supplier Cost Comment

Itemlist

This procedure applies to the following items:

(cp003),

Required Items

The following items are referenced in the procedure and will be required to complete it.

This table is populated automatically with the items that are referenced in the text in the instructions.

Item Attributes In Stores?

Instructions

                    Look over the compressor for any obvious defects 

and check the oil level .

                    Connect cylinders to the hoses. Once all tanks are connected, switch on the cylinder valves and listen for and fix leaks. If
                        is missing or damaged then replace it. Spare tanks may be required to blank off spare hoses and these can remain switched off
                        Check that fill hoses are in good condition

                    A DIN tank must be filled by inserting the  and tightening with the 

                    Nitrox tanks must be filled using the
                        . This filter has a maximum flow rate that is substantially less than that of the compressor so if it is used other cylinders must also be filled at the same time. If in doubt refuse to fill the cylinder.

                    In line valves upstream of the tanks need to be opened, those downstream must be closed

                    Put on  and start the compressor