UBUC Maintenance Documentation

This club exists to provide for its members facilities, opportunity and training for underwater exploration, science, and sport.

Back To Contents

BCD 16 is currently missing

Edit this item

Other Attributes

Part Attributes Applicable Procedures
Main
  • colour = yellow
  • manufacturer = AP Valves
  • model = Commando
  • newvalue = 412
  • size = Medium
  • status = missing
Record
Complete
Difficulty Procedure Last Compleated Interval (Months) Estimated Cost
BCD Usage
BCD Inspection 2015-10-07 12
BCD Service 2012-07-22 12 89
Non-diving oxygen cylinder testing 60

References

Logs

Add new log entry

Date Member Supplier Cost Comment Type Comment
2017-09-10 Sam Walder Condition: missing I can't find it, did find loads of unlabled ones in this check though
2016-02-13 Lauren Roberts AP Valves Condition: broken Bladder leak
2015-10-07 Carla Greco Condition: working Procedure: BCD Inspection Inflator hose cleaned
2014-04-19 Tim Walsh 412.00 Condition: quote Current new replacement cost
2014-03-15 Tim Walsh Condition: damaged Pool use only
2014-03-15 Tim Walsh Added QR Code label
2013-10-26 Tim Walsh Condition: damaged Pool use only
2012-07-22 Alex Bourla AP Valves 50.00 Procedure: BCD Service Alumni Grant funded service of Buddy BCDs and AP valves offered a discount