Cylinder 09 is currently broken

Edit this item

Other Attributes

Part Attributes Applicable Procedures
Main
  • WC = 10L
  • manufacturer = Faber
  • mass = 15kg
  • material = steel
  • newvalue = 170
  • repaircost = 20
  • serial = 03/0125/069
  • status = broken
  • year = 2003
Record
Complete
Difficulty Procedure Last Compleated Interval (Months) Estimated Cost
Cylinder Operation
Cylinder Check 2016-01-10 6
Visual Inspection 2018-12-01 30 20
Hydraullic Test 2018-12-01 60 23.2
Non-diving oxygen cylinder testing 60

References

Logs

Add new log entry

Date Member Supplier Cost Comment Type Comment
2021-07-01 UBUC Daemon 20.00 Condition: broken Visual Inspection; out of date
2020-12-15 Greg Quick Condition: working
2019-01-05 Bristol Channel Divers Condition: image Hydro test pass @ Bristol channel
2018-12-01 Greg Quick Bristol Channel Divers Procedure: Hydraullic Test Hydro test based on stamp, no paperwork found
2018-12-01 Greg Quick Bristol Channel Divers Procedure: Visual Inspection Visual completed with hydro
2018-05-08 UBUC Daemon 23.20 Condition: broken Hydraullic Test; out of date
2016-01-10 Daniel Chaney Procedure: Cylinder Check Moderate pitting on bottom
2015-11-29 Daniel Chaney DM Scuba 21.00 Condition: working Procedure: Visual Inspection Visual Inspection Complete
2015-11-01 UBUC Daemon 20.00 Condition: broken Visual Inspection; out of date
2014-03-15 Tim Walsh Added QR Code label
2014-01-01 Tim Walsh 170.00 Condition: quote Current new replacement
2013-04-01 Holly Vint Condition: working Procedure: Visual Inspection Visual Inspection next due Oct 2015
2013-04-01 Holly Vint Condition: working Procedure: Hydraullic Test Hydraulic Test next due Apr 2018
2010-10-01 Holly Vint Condition: working Procedure: Hydraullic Test Hydraulic Test, next due Oct 2015