Procedure Details

Details about the selected procedure

Back To Contents Page

Editing This Procedure

You can edit this procedure online to update it for the next person who needs to do it.

Visual Inspection

Back To Contents

Details

Procedure Log

This procedure has been completed on the following occasions.
Date Member Supplier Cost Comment
2014-04-03 Tim Walsh JR Services 20.00 Inc VAT excluding discount combined visual and hydro was £43.2 For planning I'll estimate inspection as £20
2014-02-22 Daniel Chaney JR Services 36.00
2014-02-22 Daniel Chaney JR Services 20.00
2013-11-11 Tim Walsh 20.00 Budget Estimate for Visual Inspection=£25

Itemlist

This procedure applies to the following items:

(cl001), (cl002), (cl003), (cl004), (cl005), (cl006), (cl007), (cl008), (cl009), (cl010), (cl011), (cl013), (cl014), (cl015), (cl016), (cl018), (cl020), (cl021), (cl022), (cl023), (cl024), (cl025), (cl026), (cl029), (cl030), (cl031), (cl032), (cl033), (cl034), (cl035), (cl036), (cl037), (cl038), (cl040), (cl041), (cl071), (cl072), (cl073), (cl074), (cl075), (cl081), (cl084), (cl085), (cl087), (cl090), (cl091), (cl092), (cl096), (cl012), (cl017), (cl019), (cl027), (cl028), (cl089), (cl088), (cl093), (cl094), (cl095), (cl097), (cl098), (cl099), (cl100),

Required Items

The following items are referenced in the procedure and will be required to complete it.

This table is populated automatically with the items that are referenced in the text in the instructions.

Item Attributes In Stores?

Instructions

Summary

Lux cylinder manual Scuba cylinders must be inspected every 2.5 years by a licensed commercial company.