UBUC Maintenance Documentation

This club exists to provide for its members facilities, opportunity and training for underwater exploration, science, and sport.

Back To Contents

Cylinder 24 is currently decomissioned

Edit this item

Other Attributes

Part Attributes Applicable Procedures
Main
  • WC = 10L
  • manufacturer = Rothminions
  • material = steel
  • newvalue = 200
  • serial = 25142
  • status = decomissioned
  • year = 2001
Record
Complete
Difficulty Procedure Last Compleated Interval (Months) Estimated Cost
Cylinder Operation
Cylinder Check 6
Visual Inspection 2014-02-05 30 20
Hydraullic Test 2014-02-05 60 23.2
Non-diving oxygen cylinder testing 60

References

Logs

Add new log entry

Date Member Supplier Cost Comment Type Comment
2020-12-15 Greg Quick Condition: decomissioned Still missing, assuming it's long gone
2017-10-10 Sam Walder Condition: missing I currently am not sure where this is
2016-09-01 UBUC Daemon 20.00 Condition: broken Visual Inspection; out of date
2014-04-19 Tim Walsh 200.00 Condition: quote Current new replacement cost=£200
2014-02-05 Daniel Chaney JR Services Condition: working Procedure: Hydraullic Test Hydraulic Test
2014-02-05 Daniel Chaney JR Services Condition: working Procedure: Visual Inspection Visual Inspection
2014-02-05 Daniel Chaney JR Services 40.00 Condition: working Combined tests cost £39.24 inc VAT and discount