UBUC Maintenance Documentation

This club exists to provide for its members facilities, opportunity and training for underwater exploration, science, and sport.

Back To Contents

Cylinder 92 is currently broken

Officers

Other Attributes

Part Attributes
Main
  • WC = 12.2L
  • currentvalue = 200
  • material = steel
  • repaircost = 20
  • shape = Dumpy
  • status = broken
Cylinder Operation
Cylinder Check 6
Visual Inspection 2015-09-01 30 20
Hydraullic Test 2014-04-01 60 23.2

References

Log

Date Member Supplier Cost Comment
2018-04-10 UBUC Daemon 20.00 Visual Inspection; out of date
2018-03-01 Sam Walder 200.00 New value updated to: 200
2015-09-01 Sam Walder Inferred test date from sticker. This entry added as part of checks on 13-10-2017
2014-04-01 Sam Walder Inferred test date from sticker. This entry added as part of checks on 13-10-2017