UBUC Maintenance Documentation

This club exists to provide for its members facilities, opportunity and training for underwater exploration, science, and sport.

Back To Contents

Portable Comp. is currently decomissioned

Edit this item

Image

Other Attributes

Part Attributes Applicable Procedures
Main
  • manufacturer = Hamworthy
  • mass = 185kg
  • model = BP-P10
  • newvalue = 7500
  • status = decomissioned
  • Engine
    • manufacturer = Honda
    • model = GX390
    • power = 13Hp
    • serialNo = 3428090
  • Air Filter
    • Serial = 7247
    • manufacturer = Hamworthy
    • model = PAS9
  • Compressor Unit
    • Serial = 75016
    • manufacturer = Hamworthy
    • model = 4S12
Record
Complete
Difficulty Procedure Last Compleated Interval (Months) Estimated Cost
PC Operation
Breathing Air Test 2012-06-14 3 50
PC eng service 12 108
PC Filter ser 2015-06-01 12 60
Safety Inspection 12 420
P Comp Service 2012-06-14 24 300
Filter Tower Test 2011-02-04 60 120
Non-diving oxygen cylinder testing 60
Replace Filter Tower 1988-09-19 240 1050

References

Logs

Add new log entry

Date Member Supplier Cost Comment Type Comment
2020-11-16 Greg Quick Condition: decomissioned Scrapped
2015-08-13 Tim Walsh Condition: image PAS9 filter tower cap
2015-08-12 UBUC Daemon 1928.00 Condition: broken PC eng service;Replace Filter Tower;P Comp Service;Breathing Air Test;Safety Inspection; out of date
2015-06-01 Damian Wozniak Procedure: PC Filter ser Replaced by Damian Prior to Skomer
2014-01-08 Tim Walsh 560.00 Condition: damaged Filter out of date and compresssor service out of date
2014-01-08 Tim Walsh 560.00 Condition: damaged Filter out of date and compresssor service out of date
2014-01-01 Tim Walsh 60.00 Condition: damaged The filter will be completely out of date
2013-05-10 Tim Walsh 7500.00 Condition: quote Current replacement cost £7485.60
2013-05-07 Tim Walsh Condition: working Bolted the belt guard using M6 nyloc bolts
2012-06-31 Tim Walsh Condition: damaged The guard is mssing on the drive belts
2012-06-14 Holly Vint Central Compressors Procedure: Breathing Air Test Air Purity Test
2012-06-14 Holly Vint Central Compressors Procedure: P Comp Service Compressor Serviced
2012-06-14 Tim Walsh Condition: niggle Procedure: P Comp Service Compressor out of Service
2011-02-04 Tim Walsh Central Compressors Procedure: Filter Tower Test Hydro Test
1988-09-19 Tim Walsh Procedure: Replace Filter Tower Date of PAS9 Filter